|
|
|
Name: | MVP Terminalling, LLC. | Address: | MVP Terminalling
3449 HWY 225
Pasadena, TX 77503 | Phone: | 713-353-8432 | Restrictions & Limitations: | Spares and provisions launches allowed. No deliveries across the dock. Please contact Houston Operations for facility fees. Maximum deep drafts posted are maximum project draft. Please contact Houston Operations for current draft. | Security Requirements: | TWIC required // Gate list with visitors and crew list for shore leave |
|
|
|
|
There are no documents attached to this terminal. |
|
|
|
|
|
|
|
Berth Name | Position | Max Draft | Max LOA | Beam | BCM | Last Updated |
---|
MVP # 1 | 29.44166 -95.9244 | 40.00'
| 810.00'
| 116.00'/35.36m
| N/A | Friday, February 07, 2020 | MVP # 2 | | 40.00'
| 750.00'
| 116.00'/35.36m
| N/A | Friday, February 07, 2020 |
|
|
|
Berth Name: | MVP # 1 | Position: | 29.44166 -95.9244 | Berth Telephone: | 713-353-8432 | Berth Contacts: | 713-353-8431 | Draft: | 40.00' / 12.19m
| LOA: | 810.00' / 246.89m
| Beam: | 116.00' / 35.36m
| BCM: | N/A | Air Draft: | N/A | Water: | Fresh | Normal Side Too: | Port/Starboard | Ship Handling Notes: | HSC Air Drafts Restrictions
Power Lines 197’ (Morgan’s Point)
Power Lines 197’ (below Fred Hartman Bridge – Baytown)
Fred Hartman 175' (Baytown/LaPorte Bridge)
Power Lines 197’ (Battleship Texas)
Jesse Jones 175' (Beltway 8 Bridge)
Air drafts clearances are based on MHW // Vessels should allow an additional 10 feet clearance for the Power Lines
| Access For Stores: | Yes | | |
|
|
|
|
|
|
|
|
|
|
|