|
|
|
|
|
Houston > Pages > Terminal Information
|
|
|
|
|
|
|
|
|
Name: | Oil Terminal | Address: | Port of Galveston Galveston, TX 77553 409 766 6113
| Phone: | 409 763 2641 | Contacts: | Dock Foreman | Restrictions & Limitations: | Call For More Information | Security Requirements: | - Gatelist required with full names of all attending persons, including crewlist. - Crew are permitted shore leave access. - Terminal must be notified via radio of any incoming barges and/or launches for any/all deliverys. Said notification to take place prior barge/launch arrival alongside vessel. Failure to comply will result in USCG notification.
USCG PFS Plan Info: USCG approval date: unknown PFS Officer/Phone : Earl Kalsnes (409 766 6115) |
|
|
|
|
There are no documents attached to this terminal. |
|
|
|
|
|
|
|
There are currently no Berths assigned to this Terminal. |
|
|
|
Berth Name: | # 1 | Position: | 29.736757 -95.130322 | Berth Telephone: | 281-457-7979 | Berth Contacts: | | Draft: | 40.00' / 12.19m
| LOA: | 860.00' / 262.13m
| Beam: | 160.00' / 48.77m
| BCM: | 430.00' / 131.06m
| Air Draft: | 175.00' / 53.34m
| Manifold Size: | 2 X 16" Arms - Clean // 1 X 6" Hose - Black // 1 X 4" Hose Black // 1 X 8" Vapor | Cargo Handled: | HG & Fuel Oil | Water: | Fresh | Normal Side Too: | Port/Starboard | Ship Handling Notes: | Maximum deep draft listed above are project drafts. Contact Moran Houston Operations for actual maximum Deep Draft. Provisions and spares launches allowed. Bunkers X-pipe only. No bunker via barges. or lube oil barges allowed. Contact Moran Ops for facility fees.
HSC Air Drafts Restrictions
Power Lines 197’ (Morgan’s Point)
Power Lines 197’ (below Fred Hartman Bridge – Baytown)
Fred Hartman 175' (Baytown/LaPorte Bridge)
Power Lines 197’ (Battleship Texas)
Air drafts clearances are based on MHW // Vessels should allow an additional 10 feet clearance for the Power Lines
| Access For Stores: | Yes | | |
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
 |
 |
 |
|